Services Our Work Reviews Coverage FAQ +1 647 559 1300 Get a Quote
Christmas Lights Forest Hill, Toronto · · 5h job · crew of 2

Christmas-lights install, three-storey Forest Hill, full eaves + tree wrap

Eaves on three sides, two pillar wraps, and a 25-foot front spruce. Warm-white commercial-grade C9 bulbs, all on a single GFCI line with timer. Removal booked for January.

First-time customer, switched from DIY after a fall the previous winter. Three-storey detached, full perimeter on three sides plus two front-entry pillar wraps and a 25-foot blue spruce in the front yard.

What we did

Five hours, two people, one Saturday morning:

  • Mapped power needs first, single dedicated GFCI on the front porch handles everything (no extension daisy-chains)
  • C9 commercial-grade warm-white bulbs along all eaves, clipped not stapled
  • Pillar wraps with mini-string mesh, secured top and bottom
  • Spruce wrap done from inside-out (top first, branches outward), avoids tangles
  • Tested the full system on a programmable timer (4:30pm on, 12am off)
  • Logged the layout and clip pattern for next year, we'll do the same install in 3 hours flat

January removal

Christmas-lights install is the easy half. Removal in January is what most DIY-ers underestimate, that's when ladders are icy and the clips have frozen on. We come back, take everything down, label-and-store the strings, and put them in your basement bin. No surprise cleanup work for you in March.

More from this job

“We've done it ourselves for ten years. Last year I fell off the ladder. This year I called Husky. Worth every dollar, they were back January 8th to take everything down.”

- Tom S., Forest Hill

Want results like these on your home?

Fixed quote upfront. Same-week booking in our core zones. Photos before, during, and after.

← Back to all our work