Every job documented with photos. Pick a recent one to see what we mean by "fixed quote, real result, no surprises."
Flagstone pool deck plus the pool-equipment pad. Algae across the joints, mineral staining where the auto-cover drained, pad needed degreasing. Pool opens on May 1.
Decade-old interlock driveway with set-in dirt, moss between the joints, and faded color. Restored in a single afternoon. Owner asked us to come back for the back patio.
320 sq ft deck, pressure-treated boards installed 4 years ago, never re-stained. Stripped to bare, sanded, two coats of solid-colour stain. Ready for patio season.
Stone patio, gas BBQ, outdoor dining set. Full spring reset before the first warm-weekend dinner. Stains pulled, BBQ deep-cleaned, set re-conditioned.
Customer wanted concrete-block driveway edging painted to match the new front door (charcoal grey). Outdoor masonry paint, two coats, looked like a pro mason laid black stone.
Two-storey detached after winter, interior plus exterior on every window, including the cathedral window in the front entrance.
Cedar pergola plus a 16-foot privacy screen, both sun-bleached and starting to crack. Stripped, sanded, deep-tone semi-transparent stain. Took two days. First job of outdoor season.
Two-bay garage converted to home gym. Walls primed and painted bright white, floor sealed with epoxy, ceiling LED-prepped. Ready for the equipment delivery on Monday.
Finished basement, 800 sq ft including stairwell. Old paint had yellowed from cigar smoke (previous owner). Two coats of low-VOC, smell gone by Sunday evening.
Front door and four window shutters, switched from faded forest green to satin black. Half-day job, dries indoors, looks like new without replacing any hardware.
Whole main floor, baseboards, door frames, and crown moulding. Switched from off-white builder beige to crisp white. Two days of drying, no smell by Monday morning.
Customer noticed a leak inside the master bedroom ceiling. Ice dam had backed up two metres of melt under the shingles. Cleared the dam, freed the gutter, no roof damage.
Two-bay garage door (steel), heavy oxidation on the south-facing panels. Repainted indoors using the heated garage as a controlled environment. Dries overnight, ready by morning.
Pre-holiday inside-and-out clean, three storeys, 18 windows including the great-room cathedral. First-time customer, booked again for spring.
Six panels of side-yard fence, owner had primed two weeks earlier and ran out of weather. We finished the topcoat in the last warm Saturday of the season, 10°C, dry, sunny.
Eaves on three sides, two pillar wraps, and a 25-foot front spruce. Warm-white commercial-grade C9 bulbs, all on a single GFCI line with timer. Removal booked for January.
120 feet of weathered cedar privacy fence restored before the snow. Stripped to bare wood, sanded smooth, two coats of UV-blocking semi-transparent stain.
Two-storey detached, full gutter sweep + downspout flush, day before the first freeze warning. Two clogged elbows cleared, one bracket re-secured.
Fixed quote, on-time arrival, photos before and after. Same week in our core zones.